A building owner does not need a pile of drawings at handover. They need reliable information about every asset they now have to operate and maintain. On a BIM project, that information comes out of the model, so it has to be planned for from the start.
What COBie is
COBie (Construction Operations Building information exchange) gathers the non-graphical information in a model into one structured spreadsheet: what each component is, where it is, and the details the owner needs to look after it.
What IFC is
IFC (Industry Foundation Classes) is an open, vendor-neutral format. It carries the 3D geometry and the information attached to each component, so any software can read it, not just the package it was modelled in.


When they are produced
COBie and IFC data are extracted from the 3D model at key milestones to meet the client’s Employer’s Information Requirements, as set out in ISO 19650 and BS 1192-4. Each data drop is a chance to check the information is complete before it is needed.
Planning for a handover that works
- Read the Employer’s Information Requirements early, and agree what each milestone must contain.
- Build the models to carry the right level of detail from the start, rather than adding it at the end.
- Check each COBie drop for gaps before the next stage begins.
- Keep the model live through construction, so the as-built record matches what was installed.
All our models are COBie compliant and follow industry best practice, so the final as-built model carries the asset information the client needs from day one of operation.