Data centres are programme-critical builds. The halls are dense with services, the client is often planning further phases before the first is finished, and there is no slack in the schedule for a fire protection design that has to be reworked on site.
The insurer sets the rules
Many data centre operators are insured by FM Global, so its Data Sheets set the design basis. Confirming that at the start, along with any group standards the operator applies across its estate, avoids redesign later.
Different systems for different spaces
A data centre rarely relies on one system throughout. Different areas can call for different approaches, and combining sprinkler and water mist systems is one way to protect each space appropriately. The challenge is the water supply: it has to give every system the duration it needs at the same time.


In practice
For a large data centre development in Germany, we produced an early-stage consultancy design to FM Global Data Sheets, combining sprinkler and water mist systems. We had to show that a single water supply could serve both systems for the required duration, and that the design could scale with the site.
We designed and coordinated the system in 3D, so the client could see the fire protection fully coordinated within the building. They received the drawings, calculations and 3D models to take to fire protection contractors for tender, and the tender pack went out on time.
What to settle early
- The design basis: FM Global, other insurer requirements and the operator’s own standards.
- Which spaces need which system.
- Water supply and duration for every system running together.
- Space for valve sets, tanks and pump rooms, before the plant layout is fixed.
- Coordination with the dense mechanical and electrical services in the halls.